Article 250 - Grounding and Bonding, based on the 2017 NEC - Part 2 of 2  

 
 
 
 

For EC&M Magazine

By Mike Holt, NEC Consultant

Grounding and Bonding - Article 250, based on the 2017 NEC - Part 2 of 2

Click here to read Part 1 of 2, if you missed it, or would like to review it.

 

Do you understand and correctly apply the requirements for grounding electrode systems and grounding electrode conductors?

One common NEC violation is an installation where grounding electrodes aren’t bonded together. All grounding electrodes present at a building must be bonded together to form the grounding electrode system.

Have you seen this rule violated? Have you violated it yourself? And what kinds of items are considered grounding electrodes?

Electrode types
Each of the following can serve as a grounding electrode [250.52]

  • Metal underground water pipe in direct contact with the earth for 10 ft or more [250.52(A)(1)].
  • Metal in-ground support structure(s) in direct contact with the earth vertically for 10 ft or more [250.52(A)(2)].
  • Concrete-encased electrode that is either one or more electrically conductive steel reinforcing bars of at least ½ in. diameter, mechanically connected together by steel tie wires (or other effective means) to create a 20 ft or greater length [250.52(A)(3)(1)] or a bare copper conductor not smaller than 4 AWG and at least 20 ft long [250.52(A)(3)(2)].
  • Ground ring consisting of at least 20 ft of bare copper conductor not smaller than 2 AWG buried in the earth encircling a building [250.52(A)(4)].
  • Rod electrode with at least 8 ft in length in contact with the earth [250.53(G)] and diameter of at least 5⁄8 in., unless listed [250.52(A)(5)].
  • Other listed grounding electrodes [250.52(A)(6)].
  • Bare or electrically conductive coated iron or steel plate at least ¼ in. thick, or a solid uncoated copper metal plate at least 0.06 in. thick, with an exposed surface area of at least 2 sq ft [250.52(A)(7)].
  • Metal underground systems, piping, and well casings [250.52(A)(8)].

You can’t use any of these as a grounding electrode:

  • Underground metal gas-piping systems [250.52(B)(1)].
  • Aluminum [250.52(B)(2)].
  • Swimming pool reinforcing steel [250.52(B)(3)]

The 2017 Code changes to 250.52 clarified that structural metal is allowed to be an electrode. It added a requirement prohibiting the use of swimming pool steel as an electrode.

The structural metal is now called “metal in-ground support structure(s).” The metal of a building isn’t a grounding electrode unless it’s actually in the earth for ten vertical feet, hence the name “metal in-ground support structure(s).”

Structural metal that isn’t an electrode (because it isn’t in the earth for ten feet) can still be used to interconnect electrodes [250.68(C)(2)].

Electrode installation requirements
The 2017 NEC revised the installation requirements for ground ring electrodes, for consistency with other rules. Instead of “burying” a ground ring, we now “install” it.

Some highlights of 250.53 to be aware of:

  • If practicable, pipe electrodes must be embedded below the permanent moisture level and be free from nonconductive coatings (e.g., paint or enamel) [250.53(A)(1)].
  • A rod electrode must be supplemented by an additional electrode that’s bonded to the service disconnect or one of the other four items listed in 250.53(A)(2).
  • The supplemental electrode for a rod electrode must be installed at least 6 ft from the rod electrode [250.53(A)(3)].
  • Electrodes for premises systems must be at least 6 ft from lightning protection system grounding electrodes [250.53(B)].
  • Two or more grounding electrodes bonded together are considered a single grounding electrode system.
  • The bonding connection for the interior metal water piping system, as required by 250.104(A), can’t depend on equipment likely to be disconnected for repairs or replacement. Install a bonding jumper around insulated joints and equipment likely to be disconnected for repairs or replacement [250.53(D)].
  • When an underground metal water pipe grounding electrode is present, it must be used as part of the grounding electrode system [250.52(A)(1)].
  • Rod electrodes must be installed with at least 8 ft of length in contact with the soil. If rock bottom is encountered, the rod must be driven at an angle not to exceed 45 degrees from vertical [250.53(G)].

Lightning protection electrode
The 2017 NEC revised the two Informational Notes regarding lightning protection electrodes [250.60]:

  • Informational Note 1 revisions directs us to 250.106 which has other Informational Notes regarding additional rules for lightning protection equipment, not just strike termination devices (formerly known as “air terminals” or “lightning rods”).
  • Informational Note 2 revision clarifies that it’s talking about voltage differences.

A lightning protection system installed per NFPA 780 is intended to protect the structure from lightning damage. You can’t use the lightning protection electrode for the building (or structure) grounding electrode system required for service equipment [250.24] and remote building feeder disconnecting means [250.32(A)]. Electrodes that are part of a lightning protection system must be bonded to the building grounding electrode system [250.106].

Grounding electrode conductor installation
Grounding electrode conductors must be installed as specified in 250.64(A) through (F). In this Code cycle the Code Making Panels made an effort throughout the NEC to improve its usability. Thus these requirements were reorganized into a list so they’re easier to read and understand.

It’s a fairly long list that we don’t need to restate here. But one key requirement is grounding electrode conductors sized 8 AWG must be protected by installing them in rigid metal conduit, intermediate metal conduit, PVC conduit, electrical metallic tubing, Type XW reinforced thermosetting resin conduit (RTRC-XW), or cable armor [250.64(B)(3)].

A ferrous metal raceway containing a grounding electrode conductor must be made electrically continuous by bonding each end of it to the grounding electrode conductor [250.64(E)].

Also, remember that this is grounding (connecting to the earth, see Article 100 definition). That means grounding electrodes are for supply side, not load side, equipment. A grounding electrode conductor can be connected from an accessible enclosure on the supply side of the disconnect to one or more of the following locations [250.64(D)(3)]:
(1) The service neutral conductor.
(2) The equipment grounding conductor of the feeder circuit.
(3) The supply-side bonding jumper.

Grounding electrode conductor size
The rules in 250.66(A), (B), and (C) (which many people don’t read) allow for smaller grounding electrode conductors for driven rods, concrete-encased electrodes, and ground rings than those in Table 250.66. Previous to the 2017 Code, you could use these smaller grounding electrode conductors only when the grounding electrode conductor is the “sole connection” to these electrodes.

What exactly does “sole connection” mean? We won’t be asking this question any longer, because that language was replaced. You can use the smaller grounding electrode conductors if they don’t also connect to an electrode requiring a larger grounding electrode conductor.

Grounding electrode termination
The 2017 NEC clarifies requirements for a grounding electrode conductor connection to [250.68(C)]:

  • A metal underground water pipe.
  • Building steel that’s a grounding electrode conductor.
  • Rebar electrodes that extend vertically through a slab.

For quite some time, we’ve had to connect to the underground metal piping system as part of grounding the electrical equipment. Because of the concern over interior metal piping being replaced with nonmetallic varieties, the Code has required making the grounding electrode connection within five feet of where the metal underground water pipe enters the building. This rule was accidentally changed to permissive language during some of the (rather extensive) editing of this section previously. The issue is resolved now by making it mandatory text once again.

The structural metal of a building isn’t always a grounding electrode. In fact, it seldom is. But we can use it as a conductor to interconnect electrodes, and it makes a great one with all of the cross-sectional area that it has. If we connect the structural metal to a concrete-encased electrode it doesn’t magically become an electrode (it still doesn’t have ten feet of steel vertically in the earth). But it can now be used to connect, say, the underground water pipe to the concrete-encased electrode. You can connect the concrete-encased electrode to the metal by connecting the bolts in the footings to the rebar (concrete-encased electrode) in the footings.

The practice of continuing a piece of rebar vertically through the top of a foundation wall and connecting a grounding electrode conductor has been done for decades, and it’s proven effective. In the 2014 Code it was made clear this practice is acceptable. In 2017, it’s being made clear this practice is permitted only if the exposed rebar isn’t subject to corrosion and if it doesn’t make contact with the earth.

 

 
 

Post a Comment

View Comments

Unsubscribe

 
 
 
 
 
 
 
Visit: Exam Preparation | Continuing Education | Code Products | Newsletters | and more
Copyright© Mike Holt Enterprises of Leesburg, Inc. All Rights Reserved This article is protected by United States copyright laws and may not be published without prior written permission.
Mike Holt Enterprises of Leesburg, Inc. 3604 Parkway Blvd. Suite 3 Leesburg, FL 34748
"... as for me and my house, we will serve the Lord." [Joshua 24:15]
Comments
  • Under - Grounding electrode conductor installation, the last sentence.

    In 2017 it's been made clear this practice is permitted only if the the exposed rebar is't subject to corrosion and it "DOESN'T" make contact with the earth.

    Is this correct?

    terry mundle  April 5 2017, 11:02 am EDT
    Reply to this comment

  • 250.53(G)rod and Pipe electrodes can be installed in a trench (horizontally @ at least 30" deep) if rock is encountered @ 45 degrees.

    Harold  March 27 2017, 4:05 pm EDT
    Reply to this comment

  • We recommend bending a 90 degree bend on a galvanized ground rod and connect that to the rebar in the footer. That way the rod protruding from the footer is galvanized and since it is not a piece of copper it doesn't tend to walk off as readily

    Perry Collins  March 27 2017, 2:11 pm EDT
    Reply to this comment

  • Underground metal gas-piping systems not permitted to be used as grounding electrodes per [250.52(B)(1). However 250.104(B)states that "Gas piping, if installed in or attached to building...Shall be bonded to grounding system" Does the gas piping not then qualify as an "grounding Electrode"?

    Harold  March 27 2017, 12:03 pm EDT
    Reply to this comment

  • so, I should be bonding cast iron waste line entering (leaving) building if it runs underground for 10' or more?

    MJF ELECTRIC  March 25 2017, 8:56 am EDT
    Reply to this comment


Get notified when new comments are posted here
* Your Email:
 
        
 
Add Your Comments to this Newsletter
* Your Name:
   Your name will appear under your comments.

* Your Email:
   Your email address is not displayed.
* Comments:

Email Notification Options:
Notify me when a reply is posted to this comment
Notify me whenever a comment is posted to this newsletter