Article 800: Communications Circuits
 

 
Topic - NEC
Subject
- Article 800: Communications Circuits

November 6, 2006  

Ask a Question |  Weekly Code GraphicQuizzes |  Free Stuff InstructorsOnline Training Products | Seminars | SubscribeUnsubscribe
[ image1 Post Comments | View Comments | Notify Me When Comments Are Added ] Web Page Version [Printer-Friendly]    

Article 800: Communications Circuits

 

By Mike Holt for EC&M Magazine

 

Don’t get twisted around when installing communications circuits.

Because Article 800 has its roots in telephone technology, it addresses telephone and related systems that use twisted-pair wiring. The telephone utility typically provides the twisted-pair cable to a terminal board. This board is usually part of an assembly referred to as the Network Interface Device (NID). You will normally find the NID at the “Point of Entrance” (Sidebar 1). Wiring from that point forward falls within the scope of Article 800.

Cable Installation

The NEC requires installation in a “neat and workmanlike manner” [800.24], but doesn’t explicitly define the meaning of that. However:

  • 800.21 requires anyone installing cables above a suspended ceiling to route them such that someone can remove the panels for access to electrical equipment.
  • 800.24 provides support and protection requirements, part of which are also found in 300.4(D).
  • The Fine Print Note (FPN) following 800.24 refers to ANSI/NECA/BICSI 568, Standard for Installing Commercial Building Telecommunications Cabling.
  • 800.3(C) requires you use 300.21 for fire-stopping requirements if you penetrate fire-resistance rated walls, partitions, floors, or ceilings.

All of this helps us understand the meaning of “neat and workmanlike,” as do standard trade practices and common sense. Attention to details is part of good workmanship. And a few strategically placed supports can work wonders—don’t be afraid to use them.

Abandoned cables

You must remove the accessible portion of communications cable that doesn’t terminate at equipment and isn’t identified for future use with a tag [800.2]. This requirement doesn’t apply to cables that are installed inside of raceways (Article 100 says they are “concealed.).

The main reason this requirement made it into the NEC is that it limits the amount of combustible items in a building, and therefore limits the spread of combustion.

Conductor clearances

Overhead communications cables must be not less than 10 ft above swimming and wading pools, diving structures and observation stands, and towers or platforms [680.8(B)]. Other overhead conductor requirements are provided in 800.44.

Underground communications wires and cables in a handhole or manhole must be separated from exposed electric light, power, Class 1, and nonpower-limited fire alarm circuit conductors by a suitable barrier [800.47]. Where practicable, maintain a separation not less than 6 ft between communications wiring and lightning protection conductors [800.53].

Protection

A listed primary protector is required for each communications circuit [800.90]. Locate it as close as practicable to the point of entrance [800.90(B)]. Keeping the shortest practicable distance between the primary protector location and the primary protector grounding conductor [800.100(A)(4)] reduces differences in potential between communications circuits and other metallic systems—very important during lightning events.

Primary protectors provide protection against overvoltage and overcurrent conditions that occur due to contact between outside communication conductors and power sources outside of the building. Thus, they allow for safe direct connection of internal power limited circuits and equipment to conductors that originate outside of the building.

Grounding Methods

The metallic sheath of communications cable must be grounded (or interrupted by an insulating joint) as close as practicable to the point of entrance. Follow the requirements of 800.100. The grounding conductor must be:

  • Insulated and listed as suitable for the purpose.
  • Copper or other corrosion-resistant conductive material.
  • Not smaller than 14 AWG.
  • As short as practicable. In one- and two-family dwellings, it can’t exceed 20 ft..
  • Run in as straight a line as practicable.
  • Guarded from physical damage. Where run in a metal raceway, bond each end of the raceway to the grounding conductor.

In a structure with a grounding means, the grounding conductor must terminate to the nearest accessible:

  • Grounding electrode system [250.50].
  • Interior metal water piping system, within 5 ft from its point of entrance [250.52(A)(1)].
  • Accessible service bonding means [250.94].
  • Metallic service raceway.
  • Service equipment enclosure.
  • Grounding electrode conductor or the grounding electrode conductor metal enclosure.

In a structure without a grounding means, install a ground rod not less than 5 ft long and 1⁄2 in. in diameter. Then bond the grounding conductor to it [800.100(B)(2)(2)] (Figure 800-17), using a minimum 6 AWG conductor [800.100(D)].

Meeting 800.133 requirements

Don’t let the fact there are eight exceptions and one FPN in 800.133 intimidate you. The first three exceptions apply to apply to conductors in raceways, boxes, and cables. The next two apply to separation from non-power-limited fire alarm circuits, and the last one applies to support of aerial conductor spans. The FPN applies to sprinklers in concealed spaces.

Five key requirements:

  • If you install communications cables in a Chapter 3 raceway, the raceway must comply with the Chapter 3 wiring method installation requirements [800.110].
  • If you install communications cables in a nonmetallic raceway listed for communications cables, the raceway must comply with 800.182 and must be installed per 362.24 through 362.56.
  • Communications wires and cables installed within buildings must be listed, but the cable voltage rating must not be marked on the cable [800.113]. Voltage markings on cables may be misinterpreted to suggest that the cables may be suitable for Class 1 or electric light and power applications [800.113 FPN].
  • Communications circuits must maintain 2 in. of separation from electric light, power, Class 1, or nonpower-limited fire alarm circuit conductors [800.133(A)(2)].
  • Communications cables must not be supported by a raceway [800.133(C)]. They also can’t be supported by, or attached to, the power service mast [230.28].

Other requirements for cables within buildings

Communications cables can be in the same raceway or enclosure as jacketed cables of any of the following:

  • Class 2 and Class 3 circuits [Article 725].
  • Power-limited fire alarm circuits [Article 760].
  • Optical fiber cables [Article 770].
  • Coaxial circuits [Article 820].

Communications conductors must not be run in the same cable with Class 1 conductors. They can be within the same cable with Class 2 or Class 3 conductors, if the cables are installed per Article 800 [800.133(A)(1)(b), 725.56(D)(1)] (Figure 800-23).

Type CMP, CMR, CMG, and CM communications cables [800.179], and listed communications raceways [800.182], can be installed in cable trays [800.154(D), 392.3(A)].

Ducts and Plenums

Communications cables must not be installed in ducts that transport dust, loose stock, or vapors [300.22(A)].

Only where necessary for the direct action upon, or sensing of, the contained air, communications cables can be installed in ducts or plenums if they are installed in electrical metallic tubing, intermediate metal conduit, or rigid metal conduit per 300.22(B).

Plenum-rated Type CMP cables [800.179(A)] can be installed above a suspended ceiling or below a raised floor that is used for environmental air [800.3(D), 300.22(C)]. Plenum-rated communications raceways [800.182] are permitted above a suspended ceiling or below a raised floor used for environmental air, but only if the raceway contains Type CMP plenum-rated cables (Figure 800-27).

Risers

Cables installed in vertical runs penetrating more than one floor must be Type CMR [800.179(B)]. Floor penetrations requiring Type CMR must contain only cables suitable for riser or plenum use. Where installed in risers, communications raceways with Type CMR and CMP cables are permitted. Type CM cables must be encased in a metal raceway or located in a fireproof shaft having a firestop at each floor.

You can install Type CM and CMX cables for all applications in one- and two-family dwellings. Plenum- and riser-rated communications cables are not required in one- or two-family dwellings.

Sidebar Two highlights some key points for proper application of Article 800. How can you hope to remember all of the details, though? One trick is to remember these three principles of Article 800:

  • Keep these communications circuits separate from other circuits, such as those used for power and lighting.
  • The need for proper bonding applies to all circuits.
  • Plan and execute the job with maintainability in mind.

If you’ll remember these principles, the details of proper application will always make sense.

Point of Entrance

The “Point of Entrance” is, simply enough, the point at which the cable enters the structure [800.2]. That may be an external wall or a concrete floor. Or it may be rigid metal conduit or intermediate metal conduit that is grounded (bonded) to an electrode per 800.100 (Figure 800-3).

You have to identify this point for two reasons:

  1. To properly locate the primary protector [800.90(B)]
  2. To know where to ground (bond) the communications cable [800.93] to the grounding system.

Article 800 Top Tips

  • Don’t attach incoming cables to the service-entrance power mast.
  • Ground the primary protector as close as practicable to the point of entrance, keeping the grounding (earthing) conductor for the primary protector as straight and as short as possible.
  • If you locate cables above a suspended ceiling, route and support them to allow access via ceiling panel removal, and be sure to identify when to use plenum rated cables or raceways.
  • Keep communications cables separated from lightning protection circuits.
  • If you install cables in a Chapter 3 raceway, you must conform to the NEC requirements for the raceway system.
  • Special labeling and marking provisions apply—follow them carefully.
  • Be sure to use the right cable type. Nothing can ruin your day faster than installing CM cables when you should have installed CMR or CMP.

 

[ View More Newsletters ] [ Send to a Friend ] [ Post Comments | View Comments | Notify Me When Comments Are Added ]

Copyright © Mike Holt Enterprises, Inc. All rights reserved.
This article is protected by United States copyright and other intellectual property laws and may not be
displayed or published on the internet without the prior written permission of Mike Holt Enterprises, Inc.

http://www.MikeHolt.com     1-888-NEC-CODE (1-888-632-2633)

Experiencing a Problem? Contact our Webmaster

Comments
  • What are some quick and accurate methods for determining if the space above a drop ceiling in an existing building is a space used for environmental air? If the customer allows me the time, I look for return air ducts and supply air ducts but it's difficult to quickly identify these in an existing building since the air supplys and returns must be ducted to use CM/CMR rated cable. Most of my competitors seem to specify CMP cable is all cases just to be safe. This will work but will also burden the customer with unnecessary material costs.

    Someone once told me that if I see a replaceable filter below the air return(similar to what we use at home) that the space above the ceiling is NOT being used for enviromental air. Conversly, if there is an open grate type of air return that allows one see directly into the area above the drop ceiling then the area above the drop ceiling IS being used for enviromental air.

    What about a commercial building or school that uses wood truss construction. Does the wood truss construction automatically disquailify the area above the drop ceiling from being used for environmental air?

    Also consider commercial buildings or schools that have fiberglass batt insulation laying on top of the ceiling tiles? Does the fiberglass insulation automatically disquailify the area above the drop ceiling from being used for environmental air?

    Any comments are appreciated.

    Thank you.

    Wire

    Wire
    Reply to this comment

  • much well :-) Look-for-american-jeep-on-eBay

    aloweremole
    Reply to this comment

  • Trying to find some guidance on approved telephone terminals for a fuel pier, must be Class 1 Division 1 compliant.

    Jeff G.
    Reply to this comment

  • Regarding Article 800.110: "If you install communications cables in a Chapter 3 raceway, the raceway must comply with the Chapter 3 wiring method installation requirements"

    In the case of a Telecom riser in a building, if I want to put pullboxes at each floor level, would I need to size the pullboxes according to NEC? I ask because if I design per NEC, the pullbox is too large to fit within the shaft that I'm utilizing.

    Rob Z
    Reply to this comment

  • Do communication cables installed underground, in a supposed wet location, from building to building, raceway or not, have to be rated for a wet location? I can not seem to find anything in 800.

    David Engelhart
    Reply to this comment

  • Article 800 and parts of 600 are electronics related articles. The local inspector says he does not inspect these installations. Being they are in the NEC I beleive that they should be installed by journeyman. The installations aroung here are pretty much cowboyed across the grid neither being straped or kept off the ceiling tiles. Abandoned cables are left and add weight to the grid. There is so much of abandoned cable in some areas that it is hard to get ceiling tiles up. What are your thoughts on this?

    Terille Stavick
    Reply to this comment

  • The 1st sentence under Grounding Methods is confusing. The parenthetical phrase (or interrupted by an insulating joint) seems to conflict with the requirement for the metallic sheath to be grounded

    djm
    Reply to this comment


Get notified when new comments are posted here
* Your Email:
 
        
 
Add Your Comments to this Newsletter
* Your Name:
   Your name will appear under your comments.

* Your Email:
   Your email address is not displayed.
* Comments:

Email Notification Options:
Notify me when a reply is posted to this comment
Notify me whenever a comment is posted to this newsletter