Selected Electrical Incidents and Occurrences - Second Quarter - April to June, 2007
 

 

Topic - Safety
Subject - Selected Electrical Incidents and Occurrences - Second Quarter - April to June, 2007

July 29, 2008
This newsletter was sent to 29562 newsletter subscribers

Ask a Question |  Weekly Code GraphicQuizzes |  Free Stuff InstructorsOnline Training Products | Seminars | SubscribeUnsubscribe
[ image1 Post Comments | View Comments | Notify Me When Comments Are Added ] Web Page Version [Printer-Friendly]    

Selected Electrical Incidents and Occurrences in Canada

Second Quarter – April to June, 2007

 

Date &       Program      Location     Accident Description

MIS ID #

 

Fatalities:

 

April 15th                Industrial               Beaverton             Worker on aluminum ladder, trying to install a sign on a

                                                                                                billboard.  Worker’s head contacted 4800 volt conductor,

                                                                                                located about 20 inches above the billboard.

 

May 9th                   Construction         Burlington            Backhoe was dragging a metal dumpster along gravelled

                                                                                                ground.  A few days earlier a 600 V trailing cable had been

                                                                                                buried in this area, but only a few inches in depth, with no

                                                                                                mechanical protection over the cable.  Cable was energized,

                                                                                                bottom skids on dumpster dug into ground and sliced into

                                                                                                the cable, making contact with one of the power conductors.

                                                                                                Worker went to unhook dumpster from backhoe, became part

                                                                                                of the phase to ground fault.

 

 

Critical Injuries:

 

April 2nd                 Industrial               Cobourg                Worker doing work on electrical panel, panel blew up.

                                                                                                Worker received burns to face and right hand, taken to

                                                                                                hospital.  Details of work being done not given.

 

May 10th                 Construction         Parry Sound         Worker was doing work inside an electrical room, received

                                                                                                burns to right forearm.  No details given of work being done

                                                                                                at the time.

 

May 15th                 Industrial               Dundalk                Worker was disconnecting a power supply, power not shut off.

                                                                                                Worker received a 220 volt shock, walked around for about 10

                                                                                                minutes then passed out.  Worker taken to hospital then

                                                                                                released.

 

May 30th                 Construction         Brantford              A millwright and a millwright apprentice received burns from

                                                                                                an arc flash.  Millwright was showing the apprentice how to

                                                                                                use a multimeter to check for voltage at a fused disconnect

                                                                                                switch.  Arc happened inside meter, propagated to line side

                                                                                                of switch.  A third worker received burns from the arc when he

                                                                                                entered the electrical room to try to shut off the power at the

                                                                                                main switch.  The investigation showed that the meter was set

                                                                                                for voltage measurement at the time.  Fused test leads were not

                                                                                                being used.

 

June 18th                 Construction         Stittsville               Worker was using a front-end loader to move some wires.

                                                                                                While exiting the loader, he contacted one of the bare

                                                                                                conductors.  Worker received 600V shock, taken to hospital.

 

June 21st                 Construction         Amaranth              Boom truck being used to replace hydro pole.  Worker

                                                                                                received a shock, went to hospital.  No details given as to

                                                                                                whether the worker was the operator or worker on ground.

 

June 25th                  Industrial               Burlington            Worker using high-voltage probe to do dielectric testing of

                                                                                                electrical equipment.  Made contact with energized tip of

                                                                                                probe, lost consciousness.

 

 

Non-Critical Injuries:

 

April 1st                  Construction         Mississauga         Worker replacing panels, hand brushed against a 347 volt

                                                                                                breaker.  Worker received a shock, taken to hospital with

                                                                                                injury to finger.

 

April 15th                Construction         Tiverton                 Worker using tool to remove bolts from a current transformer,

                                                                                                received a shock when tool made contact.  Worker taken to

                                                                                                hospital then released.

 

April 18th                Mining                   Timmins                 Worker made electrical contact, was shaken up by incident.

                                                                                                No details given of actual work being done at the time.

 

April 20th                Mining                   North Dumfries     Worker received an electrical shock while re-fuelling a

                                                                Township              vehicle.  Poor electrical ground bed for the system allowed

                                                                                                a phase-to-ground fault to go through metal braid of hose to

                                                                                                nozzle in worker’s hand to ground through worker’s body.

 

April 22nd               Industrial               La Salle                  Worker was doing forestry work, tree he was working on made

                                                                                                contact with 16 kV power line.  Worker received shocks from

                                                                                                energized tree.

 

April 26th                Industrial               Orillia                      Worker received an electrical shock while operating a

                                                                                                cut-off machine.

 

April 27th                Industrial               Toronto                 Worker using ladder to climb down into vault.  Ladder rubbed

                                                                                                against one of the cables in the vault, explosion happened.

                                                                                                Worker was injured to head and both legs.

 

April 28th                Construction         Mississauga         Electrician received a shock while installing lighting.

                                                                                                Voltage of lighting circuit not given.

 

May 1st                   Mining                   Norman                  Worker received an electrical burn to his right wrist while

                                                                Township              doing a survey visit.  Worker taken to hospital and released.

                                                                                                No details given of actual work being done at the time.

 

May 7th                   Construction         Hamilton                Utility worker received a burn from a flash, taken to hospital.

                                                                                                Details of work being done or extent of injuries not given.

 

May 8th                   Construction         Orillia                      Worker was on a 3 ft ladder, elbow made contact with a

                                                                                                damaged light fixture.  Shock caused worker to fall from

                                                                                                ladder, received scrapes to nose and hands.  Worker taken to

                                                                                                hospital then released.

 

May 15th                 Industrial               Tiverton                 Breaker was racked out, no auxiliary power supply to breaker.

                                                                                                Instructor was pointing out different parts of breaker to

                                                                                                students, received a small shock from capacitor in control

                                                                                                circuit.

 

May 16th                 Industrial               Toronto                 Worker doing work in a breaker panel, made contact with a

                                                                                                live conductor.  Injuries to both hands.

 

May 17th                 Industrial               Cambridge             Worker was removing a light fixture, touched an energized

                                                                                                wire.  Received an electrical shock to both arms.

 

May 26th                 Construction         Grimsby                 Worker using metal ladder to install vinyl siding and

                                                                                                eavestrough at residence.  Ladder contacted overhead line,

                                                                                                worker to hospital with 2nd degree burns to hands and feet.

 

May 30th                 Industrial               North Bay              Worker plugging in a computer, felt a shock.  Taken to

                                                                                                hospital for observation then released.

 

June 4th                 Construction         Ottawa                   Electrician doing wiring in parking lot, received electrical

                                                                                                shock to finger.  Taken to hospital.

 

June 7th                   Construction         Saugeen Shores   Worker operating a HI-HOE, hit overhead power lines.

                                                                Township              A second worker was standing on the ground, received a

                                                                                                shock.  Voltage of overhead lines not given.

 

June 12 th                   Construction         Toronto              Steel anchor in ceiling was energized.  Worker touched

                                                                                                anchor, received 347 V shock.  Worker taken to hospital for

                                                                                                observation.

 

June 14 th                   Construction         Toronto              Worker on ladder, cut into wires.  Power was supposed to be

                                                                                                off, it wasn’t.  Worker startled by sparks from cut wires, fell

                                                                                                off ladder, taken to hospital.  VERIFY – part of LOCKOUT

                                                                                                procedures.

 

June 20th                 Industrial               Toronto                 Worker using aluminum ladder, holding a flexible cord for

                                                                                                floodlight.  Received a shock, went to hospital.

 

June 25th                 Industrial              Guelph                   Worker doing re-roofing at a residence, made electrical

                                                                                                contact.  Worker treated and released from hospital.

 

June 27 th                   Construction          Hamilton           Workers using extension cords outside, mud and water in area.

                                                                                                One worker received a shock and fell, received lacerations to

                                                                                                face and elbow from fall.

 

Powerline Contacts – No Injuries:

 

April 2nd                 Construction         Gravenhurst          Boom struck primary cable, no details given of type of

                                                                                                equipment involved.

 

April 2nd                 Construction         Stittsville               Buried hydro line dug up, no other details of event given.

 

April 2nd                 Construction         Pickering                Boom of backhoe hit neutral of overhead line.

 

April 9th                  Construction         London                  Excavator contacted powerline.  Event description did not say

                                                                                                if line was buried or overhead.

 

April 10th                Construction         Courtright              Worker digging for foundation, used chipping gun to dig into

                                                                                                concrete.  Concrete was part of a duct bank, chipper hit

                                                                                                480 volt cable.

 

April 11th                Construction         Ingersoll                Workers were using a torpedo to do an underground bore.

                                                                                                Torpedo hit 16 kV cable, bad locates.

 

April 11th                Construction         Kanata                   Contractor digging, no locates.  Hit secondary cables.

 

April 17th                Construction         Toronto                 Dump truck hit service power lines.

 

April 17th                Construction         Wellesley West    Dump truck hit 4800 volt conductor.

 

April 18th                Construction         Scarborough         Worker was lowering scissor lift, hit service cables for

                                                                                                commercial establishment.

 

April 19th                Construction         Ottawa                   Boom of concrete pump truck broke off a tree branch.  Branch

                                                                                                landed on hydro wires, wires wound up landing on boom of

                                                                                                pump.

 

April 20th                Construction         Welland                 Excavator hit 27 kV overhead power line.

 

April 20th                Construction         Bowmanville         Contractor augering a hole, hit buried 16 kV power line.

 

April 21st                Construction         Woodstock           Truck turning around, boom caught the neutral of a power line.

                                                                                                Pole was cracked as a result.

 

April 21st                Industrial               St Catharines        Contact made with overhead 13 kV powerline.

                                                                                                No details given of equipment involved.

 

April 23rd                Construction         Ancaster               Crew severed a buried 27 kV cable.  No locates.

 

April 23rd                Construction         Oakville                  Hi-Hoe dug up a buried 16 kV cable.

 

April 23rd                Construction         Hamilton                Buried cable dug up.  No details given of cable voltage or

                                                                                                equipment involved in the event.

 

April 25th                Construction         Stoney Creek        Contact made with buried 240 V cable.  Details of equipment

                                                                                                involved not given.

 

April 26th                Construction         Sarnia                    Crane boom was raised while the crane was travelling.

                                                                                                Power line hit.

 

April 26th                Construction         Courtright              Backhoe dug up a buried 480 volt cable.

 

April 30th                Construction         Markham               Excavator hit a buried 27.6 kV buried cable.

 

May 1st                   Construction         Sudbury                 Crane contacted 7200 volt overhead line.

 

May 2nd                  Construction         North York            Tower crane contacted 27 kV overhead line.

 

May 4th                   Construction         Thunder Bay         Crew dug up buried cable service to a residence.

 

May 6th                   Industrial               Toronto                 Truck clearing catch basins, boom contacted overhead lines.

 

May 7th                   Construction         Thunder Bay         Worker was making a cut in an energized 120 volt cable.

                                                                                                Tool bridged to ground, arc happened.  No reported injuries.

 

May 8th                   Construction         Mattawa                 Excavator hit neutral of overhead line.

 

May 9th                   Construction         Fraserville              Backhoe dug up buried cable.  Voltage of cable not given.

 

May 10th                 Construction         Brampton               Dump truck hit 27 kV power line.

 

May 11th                 Construction         Thunder Bay         Shovel contacted overhead lines feeding a residence.

 

May 11th                 Construction         Welland                 Crew pulled out an abandoned pole, metal bracket on pole

                                                                                                contacted a conductor.

 

May 15th                 Construction         Thunder Bay         Crew digging, severed buried cable to residence.

 

May 22nd                Construction         Waterdown           Worker hit 16 kV overhead powerline, no details given of

                                                                                                equipment in use at the time.

 

May 22nd                Construction         Tilbury                   Boring machine contacted 240 volt service line.

 

May 23rd                Construction         Hamilton                Contact made with 240 volt overhead line, no other details

                                                                                                given of event.

 

May 23rd                Construction         Ajax                        Dump truck caught TV cable, cable contacted overhead line.

 

May 24th                 Construction         Hamilton                Event description stated that contact was made with 240 volt

                                                                                                cable, no other details of event given.

 

May 24th                 Industrial               Simcoe                   Crew felling a tree, dropped it onto primary power line.

 

May 24th                 Construction         Hamilton                Boring machine hit buried 13.8 kV cable.  Locates done

                                                                                                by a private firm.

 

May 28th                 Construction         Brampton               Crew contacted primary cable, no other details of event given.

 

May 29th                 Construction         Milton                    Bulldozer hit guy wire of hydro pole.  Knocked off power to

                                                                                                about 1/3 of town.

 

May 29th                 Construction         Ancaster               Event description mentioned 27 kV buried cable, no other

                                                                                                details of event given.

 

May 30th                 Construction         Port Hope              Heavy equipment dropped power line across Highway 401.

 

May 30th                 Construction         Gananoque           Roofer moved power lines to rest on roof.  Lines sparked,

                                                                                                roof caught fire.

 

May 30th                 Construction         St Catharines        Crew digging a trench, contacted 240 volt secondary cable.

 

May 31st                 Industrial               Whitby                  Re-feeding 2400 volt cables before relocating pole.

                                                                                                Conductors made contact with grounded surface.

 

June 1st                   Construction         Guelph                   Dump truck contacted power lines, voltage of lines not given.

 

June 1st                   Construction         Toronto                 Forklift contacted overhead lines, lines taken down.

 

June 4th                   Mining                   Sudbury                 Scoop dumping with bucket raised, operator’s foot slipped

                                                                                                off brake.  Scoop rolled backwards and contacted trolley line.

 

June 4th                   Construction         Ottawa                   Worker cutting around manhole, cut into 13 kV cable.

 

June 7th                   Construction         Ottawa                   Workers chipping concrete, hit a buried cable.  Locates had

                                                                                                been done.

 

June 8th                   Industrial               Oshawa                  Worker cutting trees, tree fell on 40 kV line.

 

June 8th                   Construction         Thunder Bay         Road construction, overhead line damaged.  No other details

                                                                                                of event given.

 

June 11 th                   Construction         Ottawa                Digging, contacted buried primary line.  No other details of

                                                                                                event given.

 

June 12 th                   Mining                    North Dumfries Dump truck parked parallel to 27 kV overhead line, raised

                                                                                                box.  Box contacted line.

 

June 12 th                   Construction        Kingston             Worker cut into 5 kV electrical cable, no injuries.  No details

                                                                                                given of tools in use at the time.

 

June 13 th                   Construction         Ancaster            Contact made with 120 volt cable, no other details of event

                                                                                                given.

 

June 15 th                   Construction         Hamilton            Dump truck with raised box hit hydro line.

 

June 15 th                   Construction         Bowmanville     Workers digging post holes, made contact with buried hydro

                                                                                                line.  Locates had been done, worker was digging at base of

                                                                                                hydro meter.

 

June 16 th                   Construction         Peterborough     Hi-Hoe pulled down a primary hydro line.

 

June 18th                   Construction        Stratford              Drilling rig contacted buried cable.  Locates had been done,

                                                                                                but did not show the cable.

 

June 19 th                   Construction         Hamilton            240 volt buried cable contacted, no details given of equipment

                                                                                                in use at the time.

 

June 19 th                   Construction         Woolwich          Event classified as powerline contact, no details given of

                                                                Township              event.

 

June 19 th                   Construction         Oshawa              Backhoe contacted 13.8 kV power line while digging an

                                                                                                excavation.  Event description did not specify buried or

                                                                                                overhead power line.

 

June 21st                 Construction         Hamilton                Contact made with 600 volt buried cable, no other details of

                                                                                                event given.

 

June 21st                 Construction         Markham               Mobile crane being moved to site.  Stored jib section came

                                                                                                loose and sheared off two hydro poles.

 

June 21st                 Construction         Cayuga                  Wind changed direction, crane boom swung into power lines.

                                                                                                Voltage of lines not given.

 

June 22nd                Construction         Hamilton                Contact made with overhead 240 volt line.  No other details

                                                                                                of event given.

 

June 23rd                Construction         Thunder Bay         Test holes being dug in parking lot, backhoe made contact

                                                                                                with 25 kV line.  Event did not specify if line was buried or

                                                                                                overhead.

 

June 25 th              Construction         East Tecumseh     Revenge of the Cables.  Box still raised while dump truck in

                                                                                                motion.  Box got caught up on a cable TV and a fibre-optic

                                                                                                line, truck rolled over on its side, hit another vehicle.

 

June 26 th              Construction        Kingston               Contractor lifting a fence section, contacted secondary line.

                                                                                                Broke service to residence.

 

June 26 th              Construction         Markham               Dump truck hit cable TV line, pulled down the primary hydro

                                                                                                line as well.

 

June 28 th              Construction        Hamilton                Workers made contact with 4 kV buried cable.  No other

                                                                                                details of event given.

 

 

Electrical Equipment – No Injuries:

 

May 23rd                Mining                   Sudbury                 Worker washing floor in lunchroom with a water hose. 

                                                                                                While spraying water around, noticed flames coming from

                                                                                                wiring of electrical heater.

 

DATA SUMMARY – Second Quarter:

 

                                Fatals:                   Criticals:              Non-criticals:                      Powerline             Electrical

                                                                                                                                                Contacts:              Equipment:

 

2007                            2                                 7                                23                                        74                             1

2006                            3                                5                                 30                                        53                             1

 

2005                            4                                9                                 17                                        60                             0

2004                            3                                4                                 16                                        48                             0

2003                            3                                7                                 25                                        39                             0

2002                            1                                9                                 17                                        28                             1

2001                            1                              13                                12                                        32                             2

               

2000                            2                                5                                 22                                        34                             1

1999                            2                                9                                 22                                        32                             0

1998                            2                                4                                 17                                        30                             0

 

 

 

 

And Finally…..

 

April 18th                Industrial               St. Catharines       A student in sex-ed class was watching a video, lost

                                                                                                consciousness for about 15-20 seconds.  Ambulance

                                                                                                called, student received minor treatment at scene.

                                                                                                No details given of what was on the video at the time, did

                                                                                                get a reaction though.

 

Information taken from Ontario Ministry of Labour MIS database

Report prepared: December 27, 2007

 

Assembled by:     Michael Reiser, P.Eng.,

                                Engineer, PSS – Kitchener District

                                E-Mail:   mike.reiser@ontario.ca

 

 

 

Click here to post a comment
[ View More Newsletters ] [ Send to a Friend ] [ Post Comments | View Comments | Notify Me When Comments Are Added ]

Copyright © Mike Holt Enterprises, Inc. All rights reserved.
This article is protected by United States copyright and other intellectual property laws and may not be
displayed or published on the internet without the prior written permission of Mike Holt Enterprises, Inc.

http://www.MikeHolt.com     1-888-NEC-CODE (1-888-632-2633)

Experiencing a Problem? Click Here

 
Comments
  • We enjoy getting these statistics in that we use them in courses and training. Aside from the sampling given in OSHAs "Fatalfacts" is there a site that provides this kind of detail for US fatalities and injuries caused from electrical arc and shock incidents? If anyone can help with this, it would be greatly appreciated and also put to good use.

    Rick
    Reply to this comment

  • Electrical equipment contains surprises. The one about the concrete anchor that was energized from penetrating a conduit was a good one. There is a device called an Innspector 7 that is supposed to be the next best thing to X-ray vision and is alleged to be able to find rebars and conduits in concrete slabs. This is advertised in Utility Products Showcase magazine.

    Oh yeah, on the way to work about 3 years ago a dump truck had somehow raised up its bed while traveling Interstate 480 and took down a sign that went all the way across the highway. Did make it to work at 6:58 a.m.

    Michael R. Cole
    Reply to this comment

  • I\'m especially disturbed by the April 18th incident. :-)

    Tim
    Reply to this comment

  • Sounds like their Sex-Ed was better than my school's.

    TJ
    Reply to this comment

  • May 30th Construction Brantford A millwright and a millwright apprentice received burns from an arc flash. Millwright was showing the apprentice how to use a multimeter to check for voltage at a fused disconnect switch. Arc happened inside meter, propagated to line side of switch. A third worker received burns from the arc when he entered the electrical room to try to shut off the power at the main switch. The investigation showed that the meter was set for voltage measurement at the time. Fused test leads were not being used.

    Would like crarification. I don't think I have seen fused leads. Are we talking about fuses in the meters? Are fused leads required?

    Thanks, David Cox

    David Cox
    Reply to this comment


Get notified when new comments are posted here
* Your Email:
 
        
 
Add Your Comments to this Newsletter
* Your Name:
   Your name will appear under your comments.

* Your Email:
   Your email address is not displayed.
* Comments:

Email Notification Options:
Notify me when a reply is posted to this comment
Notify me whenever a comment is posted to this newsletter