Grounding and Bonding of Separately Derived Systems
 

 

Topic - NEC
Subject - Grounding and Bonding of Separately Derived Systems

December 6, 2007
This newsletter was sent to 27638 newsletter subscribers

Ask a Question |  Weekly Code GraphicQuizzes |  Free Stuff InstructorsOnline Training Products | Seminars | SubscribeUnsubscribe
[ image1 Post Comments | View Comments | Notify Me When Comments Are Added ] Web Page Version [Printer-Friendly]    

Grounding and Bonding of Separately Derived Systems

By Mike Holt for EC&M Magazine

 

Separate sources require separate return paths

 

Separately Derived Systems (SDS) include most transformers. They also include any generator or UPS supplying a transfer switch that opens the neutral conductor.

 

What makes a system “separately derived?” It’s sourced from something other than a service—where there is no direct electrical connection between the two systems [Article 100].

 

This lack of a direct connection raises some interesting questions for safety and power quality. That SDS will necessarily be at a different potential (voltage) from other systems. So, for example, what happens when you transfer the load from the service, where the metal parts of the electrical equipment are connected to the service neutral, but not the generator neutral? The NEC answers such questions in 250.30, by providing the requirements for SDS.

 

System bonding jumper

 

The system bonding jumper is a conductor, screw, or strap that bonds the metal parts of a SDS to the system neutral point [250.2]. The system bonding jumper provides a low-impedance fault current path to the power supply to facilitate the clearing of a ground fault by opening the circuit overcurrent device.

 

During a ground fault, metal parts of electrical equipment, metal piping, and structural steel will become energized. This situation provides the potential for electric shock and fire. The system bonding jumper resolves this situation by creating a path from the metal parts back to the source, and allows overcurrent devices to operate, clearing the ground fault and removing the dangerous condition.

 

Dangerous objectionable neutral current will flow on conductive metal parts of electrical equipment, metal piping, and structural steel if you install more than one system bonding jumper. Because of this, you can’t have a neutral-to-case connection on the load side of the system bonding jumper, except as permitted in 250.142(B).

 

You also get objectionable current if the system bonding jumper is located somewhere other than where the grounding electrode conductor (GEC) terminates to the neutral conductor. You can terminate the GEC to the neutral conductor either at the SDS system or at the system disconnecting means. But pick one—you can’t have it in both locations [250.30(A)(3)].

 

If you install the bonding jumper at the disconnecting means:

  • Route the neutral conductor with the secondary conductors.
  • Size the neutral conductor no smaller than specified in Table 250.66, based on the area of the secondary conductors.
  • If you install the secondary conductors in parallel, size the neutral secondary conductor in each raceway (or cable) no smaller than specified in Table 250.66, based on the area of the largest ungrounded conductor in the raceway (or cable). Remember that in no case can you size the neutral conductor smaller than 1/0 AWG [310.4].
  • An equipment bonding jumper must connect the metal parts of the SDS to the neutral conductor at the disconnecting means per 250.30(A)(2).

Equipment bonding jumpers

 

You must run an equipment bonding jumper to the secondary system disconnecting means, regardless of where the system bonding jumper is installed. Where the equipment bonding jumper is of the wire type, size it per Table 250.66, based on the area of the secondary conductor in the raceway or cable.

 

Question: What size equipment bonding jumper is required for a flexible metal conduit containing 300 kcmil secondary conductors?

 

(a) 3 AWG       (b) 2 AWG       (c) 1 AWG       (d) 1/0 AWG

 

Answer: (b) 2 AWG, Table 250.66

 

Grounding electrode conductor (GEC)

 

You must install a GEC to connect the neutral terminal of an SDS to a grounding electrode of a type identified in 250.30(A)(7) [250.30(A)(3)]. But you don’t have to do this if your SDS is for a Class 1, Class 2 or Class 3 circuit, and is rated 1 kVA or less[250.30(A)(3) Ex No. 1]. Size the GEC per 250.66, based on the area of the secondary conductor.

 

To prevent objectionable neutral current [250.6] from flowing onto metal parts, the GEC must originate at the same point on the SDS where the system bonding jumper is connected [250.30(A)(1)].

 

What if you have multiple SDS? In such a case,  you can connect the neutral terminal of each derived system to a common GEC. The GEC must not be smaller than 3/0 AWG copper. Size GEC taps per Table 250.66, based on the area of the secondary conductor.

 

For multiple SDS, you also have to make GEC tap connections at an accessible location by:

  • Listed connectors.
  • Listed connections to aluminum or copper busbars not less than 1⁄4 x 2 in. If using aluminum busbars, they must comply with 250.64(A).
  • Exothermic welding.

Connect grounding electrode taps to the common GEC so the common GEC isn’t spliced.

The GEC must be:

  • Of copper where within 18 in. of earth [250.64(A)].
  • Securely fastened to the surface on which it’s carried [250.64(B)].
  • Adequately protected if exposed to physical damage [250.64(B)].

And metal enclosures enclosing a GEC must be made electrically continuous from the point of attachment to cabinets or equipment to the grounding electrode [250.64(E)].

 

System grounding reduces overvoltage caused by induction from indirect lightning, or restriking/intermittent ground faults. Induced voltage imposed from lightning can be reduced by short grounding conductors and eliminating unnecessary bends and loops [250.4(A)(1) FPN].

 

System grounding also helps reduce voltage stress on electrical insulation, thereby ensuring longer insulation life for motors, transformers and other system components.

 

Grounding Electrode

 

Install the grounding electrode as close as possible to where the system bonding jumper is located. Preferably, it will be in the same area as that jumper.

 

What can you use for a grounding electrode? Per 250.52(A), you can use a metal water pipe electrode or structural metal electrode [250.30(A)(7)].

 

But what if you don’t have one of those electrodes present? The NEC makes allowances for just such a situation. You have to use one of the following:

  • Concrete-encased electrode. It has to be encased by at least 2 in. of concrete. The question is, do you stand that electrode up vertically or lay it down horizontally? Either way is acceptable, if the electrode is within that portion of concrete foundation or footing that is in direct contact with the earth. But if it’s horizontal it needs to be near the bottom of the encasement. The electrode itself has to be at least 20 ft of electrically conductive steel reinforcing bars or rods of not less than 1⁄2 in. diameter, or it can be 20 ft of 4 AWG conductor [250.52(A)(3)].
  • Ground ring. This must encircle the structure and be buried at least 30 in. below grade. The ring must consist of at least 20 ft of bare copper conductor not smaller than 2 AWG [250.52(A)(4) and 250.53(F)].
  • A ground rod. It needs at least 8 ft of contact with the soil. It must meet the requirements of 250.56 [250.52(A)(5) and 250.53(G)]. To get the 25 ohms resistance, you may need to drive an additional rod. You don’t have to keep driving rods until you get 25 ohms, however. The rule is you must drive a second one if the first one is higher than 25 ohms. The NEC requires you to place the second rod at least 6 feet from the first one, but it’s even better if the rods are farther apart.
  • Other listed electrodes [250.52(A)(6)].

Steel and pipes

 

To ensure the quick removal of dangerous voltage from a ground fault in the area served by the SDS, connect the structural steel and metal piping of that area to the neutral conductor at the SDS per 250.104(D).

 

What happens if you don’t make this connection? You end up with a difference of potential (voltage) between your SDS and the structural steel and metal piping. During a fault condition, this could cause property damage from a fire and even prove fatal from electric shock.

 

The fact that electricity seeks to get back to its source is a fundamental concept of electrical theory. And, it’s a concept that will help you with your SDS applications.

 

Differences of potential (voltage) create hazards for people and equipment. So, you don’t want these to exist in your SDS. Nor do you want differences of potential (voltage) between systems.

 

You have to eliminate these dangerous differences of potential (voltage) while keeping systems separate. How you achieve that is a matter of how you install and connect your system bonding jumper, equipment bonding jumpers, GEC, and other bonding and grounding components. If you address each of these components per the requirements of 250.30, the electricity in your SDS will properly return to its source. More importantly, you will have averted the hazards arising from differences of potential (voltage).

 

 

Click here to post a comment
[ View More Newsletters ] [ Send to a Friend ] [ Post Comments | View Comments | Notify Me When Comments Are Added ]

Copyright © Mike Holt Enterprises, Inc. All rights reserved.
This article is protected by United States copyright and other intellectual property laws and may not be
displayed or published on the internet without the prior written permission of Mike Holt Enterprises, Inc.

http://www.MikeHolt.com     1-888-NEC-CODE (1-888-632-2633)

Experiencing a Problem? Click Here

 
Comments
  • Mr. Mike Holt,

    I have a minor comment to your article. A derived electrical system is separate from a standard system. Anytime where there is a need for a ground ( the fourth wire needed for different configurations / voltages downstream from secondary windings of a transformer, when system has 3 phases, 3 wires a derived system is created by connecting middle point of the secondary windings of a transformer to the ground.

    Such a system (3 phases, 4 wires ) is separate ( derived ) from a 3 phases, 3 wires system.

    Best regards,

    Paul V. Matei

    Paul V. Matei
    Reply to this comment

  • Mike, everyting you teach and say about bonding and grounding is to the best of my knowledge true and highly valuable information for the professional. However-and here you will strongly disagree with me- the following statement is not generally true and does not constitute a good physical-or safe- discription of the physics of electricity. "The fact that electricity seeks to get back to its source is a fundamental concept of electrical theory. And, it’s a concept that will help you with your SDS applications." Electrical flow, which depending on the conductor may electrons, protons, ions or quantum "holes", is initiated by potential dfference. Once the flow is initiated the flow of current will continue in a superconductor. Massive and seroius damage can be and has been done by people without understanding of superconducting magnets. In a resistive and reactive circuit potential difference must by maintained for current but current can still flow WITHOUT a circuit-and one can be killed by this current. Go to Tim Buck Too (okay I can't spell) and charge a big and efficient capacitor that is capable of withstanding 10,000 volts. Bring it Florida. Take it to the beach. Stand in Salt water. But don't grab one lead of that capacitor because you could be killed. This is a bit wild but because you and others think that the earth was the "source" for lightning I've stopped using that example. A battery is a little different animal. It's operation (internal) depends on ions-sometimes positvely charged ions, not necessarily electrons. Its potential difference is with its own opposite pole. Lightning is a discharge from tiny charged particles (on Earth, ice). these particles have been charged by the friction of the atmosphere, not the blooming Earth. The particles are zillions or thereabouts of capacitors in series-parallel. when the potential difference beteen two areas of the atmosphere, another cloud that is, or the Earth is sufficiently great-bam- discharge. Cloud to cloud discharge is as common as cloud to Earth and is not a circuit in any manner shape or form. Do you want me to get into the subject of plasma-naw-if you don't buy my capacitor example you won't buy plasma. Just kidding.

    Bob
    Reply to this comment

  • This needs some pictures showing exactly what is said here. There's to much room for interpretation that leads to installation errors.

    This is to important to leave to someones interpretation.

    Realize the consequences of not bonding things correctly.

    i.e. Single phase SDS...do not bond the neutral.

    With no devices on the load side of the breakers what is the voltage on each breaker when turned off.

    voltage = 0

    Now connect a device to one breaker i.e. lamp and with lamp and that breaker turned on what's the voltage on all the other breakers when they are turned off.

    Might surprise you.

    Pen & paper comes in handy....!!!

    electroman00
    Reply to this comment

  • According to the 2008 NEC the transfer switch on back up generators is to disconnect the grounded and ungrounded conductors. Therefore there should be no sharing of the neeutral of both systems.

    The grounding electrode connector should be connected to both services. That is is important that any all faults can safely be carried back to the ocd of either supply.

    Grounding rods provide a path to the earth, and that is a poor return path back to the ocd. They help suppliment the ground path.

    Structural Steel and metal piping provide a ground path only if they are bonded to the system ground. If there is no path to the ocd it is dangerous and objectionable current flow.

    Steven
    Reply to this comment

  • How can I tell if a ground rod has been driven in ground 8 ft.

    Louis Sanchez
    Reply to this comment


Add Your Comments to this Newsletter
* Your Name:
   Your name will appear under your comments.

* Your Email:
   Your email address is not displayed.
* Comments:

This newsletter is closed to new comments.

Email Notification Options:
Notify me when a reply is posted to this comment
Notify me whenever a comment is posted to this newsletter