Send to a Friend View / Add Comments  

Some of you have completed our Online Continuing Education Courses which include video instruction and know this is a very fast way to obtain your CEU credits from the comfort of the chair you're sitting in. For the rest of you we are sending a weekly series of newsletters featuring an instructional page complete with videos.

To view the videos you will need to download the free Real Player Download Real Player plugin for your browser - if you don't already have it. After installing Real Player, you can view the videos by clicking on one of these icons:

  • Click on this icon Hi Res - Cable/DSL if you have a cable or DSL connection.
  • Click on this iconLow Res - Modem if you have a Dial-up connection.

Below is the full course page which includes these videos:


2002 Changes to the NEC®
Article 692 Low Res - Modem Hi Res - Cable/DSL        Page 4 of 4
FUEL CELL SYSTEMS

692.6 Listing Requirement

The text in this new section reads:

The fuel-cell system must be evaluated and listed for its intended application prior to installation.

Intent: Because of the complexity of a fuel-cell system, the Code felt it best to require these systems to be listed as a complete assembly.

Author’s Comment: Chugach Power (Alaska) has installed the largest fuel-cell installation in the world for the US Postal service, a one-megawatt system.

Copyright © 2004 Mike Holt Enterprises,Inc.
1-888-NEC-CODE (1-888-632-2633)