Send to a Friend View / Add Comments  
GEMI Grounding and Electromagnetic Interference Program

The GEMI program performs analysis of a single steel conduit system or steady state analysis (short circuit or normal operation) of an electric power system (network) with or without steel conduits. The power system may include symmetric three phase elements as well as asymmetric three phase elements or single-phase circuits.

To download this program for free, visit http://www.steelconduit.org/gemi.htm

Grounding and Bonding Book — 2002
Grounding and Bonding textbook is all new and printed in full color. Loaded with detailed, color coded graphics, this text gets to the root of all problems associated with grounding and bonding.

Product Code: 02NCT2
Pages: 94
Illustrations: 206

Table of Contents
Sample Pages
Sample Graphic
Sample Video

Viewing Sample Video Requires Real Player [ FREE ]


  Send to a Friend View / Add Comments  

  [ Back to Top ]

Copyright © 2004 Mike Holt Enterprises,Inc.
1-888-NEC-CODE (1-888-632-2633)