Illustrated Changes to the NEC, 2005 Edition - Part 1

Article 250

Grounding and Bonding

250.50 Grounding Electrode System

Part III. Grounding Electrode System and Grounding Electrode Conductor

The words “if available” have been replaced with “are present.” The effect is that a concrete-encased electrode (Ufer) is always required for new construction, because it is present. However, a new exception adds clarity that a concrete-encased electrode [250.52(A)(3)] isn’t required for existing buildings or structures.

All grounding electrodes as described in 250.52(A)(1) through (A)(6) that are present at each building or structure must be bonded together to form the grounding electrode system. Figure 250-15

Ex: Concrete-encased electrodes are not required for existing buildings or structures where the conductive steel reinforcing bars aren’t accessible without disturbing the concrete.


VIEW VIDEO
[ Click Here to View ]    
REQUIRES

[ FREE ]
If you have already been approved for reprint permission, you may right mouse click on the link above and choose "Save Target As ..." or "Save Link As ..." to save the file to your local computer.
©2005 Mike Holt Enterprises, Inc.